Example from my drill notes the 1st 3 holes MO18001 - 3 of this drill program they report Peg intersections and Assays confirm Lithium/Spod over approx the same lengths as reported
19 Feb - Visual Peg
"...First drill hole (MO18DD001) of AVZ’s 20,000m Phase 1 drilling program intersects
295.05m* of pegmatite from 62.00m down-hole depth..."
6 Mar - Visual Peg
"...Drill-hole MO18DD002 intersected 282.95m* of pegmatite,..."
6 Apr - Visual Peg
"...Drill-holes MO18DD003, 004, 006 and 007 confirm the thickness of the Roche Dure
pegmatite, intersecting 313.88m*, 276.77m*, 284.30m* and 273.20*, respectively, of
pegmatite..."
30 Apr - Assays
"...Drill-hole MO18DD001 reported 295.03m* @ 1.75% Li2O and 856 ppm Sn from 62.0m
downhole. ..."
"...Drill-hole MO18DD002 reported 283.06m* @ 1.59% Li2O and 807 ppm Sn from 63.1m
downhole..."
"...Drill-hole MO18DD003 reported 313.88m, comprising an intersection of 13.1m* @
1.11% Li2O and 496ppm Sn from and 59.01m downhole and 289.58m* @ 1.63% Li2O
and 845 ppm Sn from 83.3m downhole...."
- Forums
- ASX - By Stock
- Ann: Manono Lithium Project drilling program
Example from my drill notes the 1st 3 holes MO18001 - 3 of this...
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)