Thus far they have always published Spod visual intersections primarily not the total of what they have drilled for each hole as that is reported separately as a EOH depth number. Many of the holes in this table are still in progress ie they are still drilling them.
Because I reckon you can work it out without having to bother them continually everytime a tiny thing is unsual/uncertain. IT will prob be cleared up in next Ann.
- Forums
- ASX - By Stock
- Ann: Manono Lithium Project drilling program
Thus far they have always published Spod visual intersections...
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)