Now, I'm with you I think Free.
Those pegmatite numbers are from the 6th of April report (not 16 May). Where page 2 has "Length of intercept* (M)" for M018DD006 and 7 and page 3 near top says M018DD008 "intercepted 72m of pegmatite". We get the End of Hole lengths in metres at page 9. And lithology for 6 and 7 (not 8) at page 11 or appendix 3.
Our posts passed each other - this is one I had prepared before I saw you had responded with a list of examples which I though suggested you were misinterpreting what I was asking.
@dossantd "Why don't you guys just ask the company for a clarification instead of second guessing what the data means ".
Well anyone can do that if they want to. I actually enjoy trying to work things out logically (and respect Freehold as a person of similar inclination - good analysis is the trading/investing edge). And personally I'm not sure the person who would answer the phone would know.
- Forums
- ASX - By Stock
- AVZ
- Ann: Manono Lithium Project drilling program
Ann: Manono Lithium Project drilling program, page-164
-
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)