@Freehold, @bpinvestnstocks is correct with regards to hole 28. Intercept lengths have not been provided since assays came out.
If you look at screenshot below you can see the two tables referred are regarding two blocks of one week drill progress. One ends around 16th May (date of report) and the other begins 21st May and ends 27th May.
The first one shows drill progress of 72m for hole 28 and second one shoes drill progress of 57m starting from 344.75m. The section between 72 and 344.75 must’ve occurred in the 5 days in between the two report blocks.
AVZ Price at posting:
14.5¢ Sentiment: Buy Disclosure: Held