So what can we expect next week?
The three holes we are expecting assays for next week reported the following intersections from May 16 Ann
MO18006 - 284m Peg
MO18007 - 273m Peg
MO18008 - Intersection was 72m of Peg (Failed Water bore hole )
Really the only question is the grade of the lithium consistent with prev results. Given the water bore holes was some distance away that result may vary and be of lower grade but the holes 6 and 8 should be good.
- Forums
- ASX - By Stock
- AVZ
- Ann: Manono Lithium Project drilling program
Ann: Manono Lithium Project drilling program, page-94
-
- There are more pages in this discussion • 77 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)