That pit looks great empty.
So much for the inability to drain the water comments.
Its easy to see why it was done. Below you have the mineralization depths in red for the drills holes. As one moves into the water (which doesn't exist anymore), the lithium is near surface. The simplest way to imagine it is by flipping all red lines (and the triangles I connected the drilling sequence with) below the surface. Homogeneous ice cream scoop mining with a crazy strip ratio AND near surface.
Looking forward to reading the DFS and the transport routes.
- Forums
- ASX - By Stock
- AVZ
- Ann: Manono Project Operational Update
Ann: Manono Project Operational Update, page-41
-
-
- There are more pages in this discussion • 28 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity