Not many options left other than drilling more development wells to suck out little pools of leftover oil in the reservoir. With 80% water production (2019 annual report) would be interesting to see how far Manora production can be stretched!
- Forums
- ASX - By Stock
- Ann: Manora 2020 Development Drilling and Workover Program
Not many options left other than drilling more development wells...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)