CLE 0.00% 0.1¢ cyclone metals limited

Ann: Marampa Infrastructure , page-22

  1. 131 Posts.
    lightbulb Created with Sketch. 12
    My understanding is that the total cost of Refurbishment of the new Railway is $135 mill

    "Cape Lambert to acqire a 33% equity interest in Marampa Infrastructure by funding 33% of Refurbishment costs."
 
watchlist Created with Sketch. Add CLE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.