    Hi Speculator, agree it looks a very good quarterly after what we have been accustomed to. I have been trying to get a read on how long Stage 2 at Gilbeys will last.... ie; how long have we got baseload supply before we need to get Gilbeys North or Yalgoo or Stage 3 going? I notice your comment above that you think Stage 2 will last until end 2023?

    "So basically, because of the changed mine plan, what you see is what you get whist they mine Stage 2 (which I believe will last until the end of 2023 approx)."

    All I have been able to find on this subject recently was this slide from 20 January 2022 AGM presentation which suggested that Stage 2 would be about 12 months;
    Slide 8
    FOCUS - PRODUCTION AND COSTS
    Production
    • Quarterly production decreased during CY21 as GMZ Stage 1
    depleted in mid CY21
    • Ore access from GMZ Stage 2 achieved later than planned due
    to rain, mine scheduling and increasingly tight labour market
    Production from GMZ Stage 2 now underway, underpinning
    next 12 months’ production

    Costs
    • General cost escalation seen across WA mining industry
    • AISC also impacted by:
    – Deferral of Stage 3 cutbacks
    – Fixed and semi-variable mining costs spread over lower
    mining volumes
    – Lower capitalised deferred waste
    – Lower June and Sept Qtr production as GMZ Stage 1
    depleted


    They may have rescheduled some movements or ammended Stage 2 to extend life?


 