stated on almost every announcement... "The process route is designed with a zero liquid discharge design. All waste products are stored in permanent impoundments (the lined evaporation ponds). At the end of the project life the ponds will be capped and returned to a similar profile following soil placement and planting of original vegetation types."
ORE Price at posting:
$2.94 Sentiment: Buy Disclosure: Held