BCI 6.56% 28.5¢ bci minerals limited

Ann: Mardie Project Update, page-219

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 85 Posts.
    lightbulb Created with Sketch. 50

    It is great to visualize the progress from the snapshots. It looks like the trail pond, camp and setting out are the only progress to date. I wonder if we can see the quantity of earthmoving equipment, the location of the borrow pits for the clay and the location of the quarry for the granular and rock fill.


    It would be ideal to construct the outer wall / toe first esp as the outer roads are built up and the clay placed is exposed, so I think what we are seeing above is the outer walls 100% finished in sections with batters on the outer side. The work on the internal levees can take place thereafter to minimize flooding damage. The civil works here are a massive operation in terms of qty of material required to be excavated / tested / crushed and placed, however a very simple operation give or take the pumping stations with long lead mec equipment, pond connections and levee protection around existing o/g flowlines.


    It would be great to get a report with percentage of civil works completed. Happy all around, just hope WBHO civil left the equipment / existing team on site.

    Last edited by HyggeLife: 15/08/22
 
watchlist Created with Sketch. Add BCI (ASX) to my watchlist
(20min delay)
Last
28.5¢
Change
-0.020(6.56%)
Mkt cap ! $822.1M
Open High Low Value Volume
30.5¢ 30.5¢ 28.5¢ $183.8K 622.1K

Buyers (Bids)

No. Vol. Price($)
14 162327 28.5¢
 

Sellers (Offers)

Price($) Vol. No.
29.0¢ 16164 1
View Market Depth
Last trade - 16.10pm 03/10/2024 (20 minute delay) ?
BCI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.