Mt K i t t y , EP 125 S a nto s as op er a to r o f th e S o uth...

  1. 7,889 Posts.
    lightbulb Created with Sketch. 1997
    Mt
    K
    i
    t
    t
    y
    , EP 125
    S
    a
    nto
    s
    as
    op
    er
    a
    to
    r
    o
    f
    th
    e
    S
    o
    uth
    er
    n A
    m
    a
    d
    e
    u
    s
    J
    o
    i
    n
    t
    V
    e
    ntu
    r
    e
    a
    d
    v
    i
    s
    es
    th
    at wi
    r
    e
    line
    l
    ogg
    i
    n
    g
    in the
    M
    t
    K
    i
    tt
    y
    exploration well has been successfully
    complete
    d
    .
    Sidewall cores confirm
    ed that
    the Heavitree Quartzite is absent
    in the well
    and
    that the previously
    reported
    gas flows
    were
    from
    granitic
    basement
    . Raw f
    ormation image logs
    indicate that basement is
    extensively fractured. This is typical of many structures
    in the Amadeus Basin, and generally enhances
    productivity.
    T
    he well is
    currently being
    plugged and suspended.
    Full evaluation of well results and integration with
    seismic may result in a decision to drill an oriented sidetrack in future, aiming to maximi
    ze intersection
    with observed fracturing.
    Central Petroleum Managing Dire
    ctor, Richard Cottee said, “Central is pleased this
    drilling
    operation has
    now
    been successfully concluded with positive indications
    of hydrocarbons
    and helium gas in
    this large
    and underexplored area.
    The results of
    Mt Kitty
    1
    has
    encouraged Santos to proceed with Stage 2
    of a
    farmin to Central’ s Southern Amadeus Basin exploration permits
    , which
    will see a
    t least
    2
    00 km of a
    total 1
    ,
    300 km seismic acquired in
    EP 125
    .

    S
    ou
    t
    her
    n
    G
    eor
    g
    i
    n
    a J
    o
    i
    n
    t
    V
    e
    n
    t
    ure
    T
    h
    e
    r
    ig
    mo
    v
    e
    t
    o
    Ga
    u
    di 1
    l
    o
    ca
    t
    i
    o
    n is nearing completion
    with
    spu
    d
    expected
    within a week.
    Dingo Development P
    roject
    Construction of the pipeline
    commenced
    this week.
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
(20min delay)
Last
4.8¢
Change
-0.004(7.69%)
Mkt cap ! $35.52M
Open High Low Value Volume
5.0¢ 5.0¢ 4.8¢ $22.36K 454.9K

Buyers (Bids)

No. Vol. Price($)
1 104163 4.9¢
 

Sellers (Offers)

Price($) Vol. No.
5.2¢ 96150 1
View Market Depth
Last trade - 11.34am 12/07/2024 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.