CYM 17.2% 3.4¢ cyprium metals limited

On the surface it seems they had a reserve of 0.127% cobalt or...

  1. 1,109 Posts.
    lightbulb Created with Sketch. 1324

    On the surface it seems they had a reserve of 0.127% cobalt or thereabouts @hotuna. with a cut-off of 0.06-0.07% Co. Equivalent to 600-700ppm.

    cut off grade can be lower depending on tonnage, other metals in the deposit, and depth as with any deposit. Haven't looked into the shape or geology just a quick scan so can't comment on AISC..

    Price of cobalt had an assumption of US $61,000 (cobalt now 71,000) but remember some metals are only 80% payable, varies between metals. so I'm going to say that if Maroochydore has an avg grade of 0.04-0.05% then it could well be economic at these prices as you'd be extracting the copper with it. Alot of variables as they were also mining avg grade nickel (0.5%) and cobalt as a by product.

    At Maroochydore it seems the cobalt grade correlates with the copper. Higher grade copper resulting in higher grade cobalt.

    No doubt It will definitely help the overral feasibility of the deposit but no reason to get too carried away until we have an idea of the size of Maroochydore. It already has a large footprint which is good. The shallowness is in our favour. If the supergene is substantial we could easily mine the oxide / supergene only, as we already have the infrastructure at Nifty do so.





    Last edited by FreeflyerNZ: 14/02/22
 
watchlist Created with Sketch. Add CYM (ASX) to my watchlist
(20min delay)
Last
3.4¢
Change
0.005(17.2%)
Mkt cap ! $51.88M
Open High Low Value Volume
3.0¢ 3.4¢ 3.0¢ $64.81K 1.994M

Buyers (Bids)

No. Vol. Price($)
1 29353 3.3¢
 

Sellers (Offers)

Price($) Vol. No.
3.4¢ 214493 4
View Market Depth
Last trade - 16.10pm 30/08/2024 (20 minute delay) ?
CYM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.