CYL 1.50% $1.97 catalyst metals limited

Per this filing, K1 open pit has gold resource of 89,000 ounces....

  1. 373 Posts.
    lightbulb Created with Sketch. 152
    Per this filing, K1 open pit has gold resource of 89,000 ounces. On page 69 of this document under section about environmental factors and I quote "K1 OP contain fibrous asbestiform mineral Tails which will need to be removed in accordance with occupational health and safety guidelines prior to commencement of mining". Previous operator gold mill located at k2/PHB/K1. The very nasty asbestos tailings from this mill are compacted at bottom of K1 open pit. Removing these asbestos tailings and then safely transporting the asbestos tailings to new storage site prior to mining K1 is a money losing proposition so it is doubtful that the 89,000 oz gold at K1 open pit can be mined economically at current gold price. Add the 410,000 oz gold at Trident UG to the 89,000 oz gold at K1 open pit equal 499,000 ounces which be almost 50% of catalyst supposed 1.002 mm oz gold reserve in plutonic dome. This 499k oz au is highly likely not able to be mined for safety or economic reason. Why is gold at Trident UG and K1 OP even included in resource statement?
 
watchlist Created with Sketch. Add CYL (ASX) to my watchlist
(20min delay)
Last
$1.97
Change
-0.030(1.50%)
Mkt cap ! $443.6M
Open High Low Value Volume
$1.97 $1.99 $1.92 $971.5K 497.0K

Buyers (Bids)

No. Vol. Price($)
2 2208 $1.93
 

Sellers (Offers)

Price($) Vol. No.
$1.98 6090 2
View Market Depth
Last trade - 16.10pm 30/07/2024 (20 minute delay) ?
CYL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.