Share
4,222 Posts.
lightbulb Created with Sketch. 789
clock Created with Sketch.
24/05/18
17:58
Share
Originally posted by MyBentley
↑
GNX Management would be prudent to explore costings of 1414 Degrees tech over pump hydro for base load power.
Look at leasing land to farmers for food production near site.
It is great that a dream to create base load power from the Kidston site has built a solar array.
World first SA University 1414 degrees break through has made the hydo pump too expensive .
1414 the GNX wind farm for base load power as a trial.
All IMO
MB
Expand
With respect:
1414 is unproven. No-one will lend them money to play with unproven technology
1414 is maybe 50% efficient at best for power. It's best suited for CHP application, but there's not much need for heat in the tropical north of QLD
I wish 1414 well, but it's not what GNX need.