JLL 3.70% 26.0¢ jindalee lithium limited

Ann: McDermitt Lithium Project - First Assay Results, page-20

  1. 2,216 Posts.
    lightbulb Created with Sketch. 1506
    Another proactive interview with LD.

    He gives a good explanation of the plan moving forward.

    • First step is to finalise the drill assays.
    • Second step is to get part of the resource upgraded to ‘indicated’ status, which is a prerequisite for releasing the scoping study. The increased inferred resource size will also improve the economics of the scoping study.
    • Third step is the metallurgy testing, which will also improve the Opex costs feeding into the scoping study.
    • Fourth step is releasing the scoping study, which should be done in March/April.
    Expecting some good newsflow over the next couple of months. With some significant rerate, particularly on the back of resource upgrades and scoping study.

    GLTA.

 
watchlist Created with Sketch. Add JLL (ASX) to my watchlist
(20min delay)
Last
26.0¢
Change
-0.010(3.70%)
Mkt cap ! $18.50M
Open High Low Value Volume
26.0¢ 27.0¢ 26.0¢ $28.62K 109.3K

Buyers (Bids)

No. Vol. Price($)
3 22511 26.0¢
 

Sellers (Offers)

Price($) Vol. No.
27.0¢ 51524 1
View Market Depth
Last trade - 14.48pm 16/08/2024 (20 minute delay) ?
JLL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.