MMI 2.38% 4.1¢ metro mining limited

Marine Traffic has the tugs practicing how to get the most out...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 580 Posts.
    lightbulb Created with Sketch. 149
    Marine Traffic has the tugs practicing how to get the most out of each high tide. I went back and looked at the tugs performance and they often waited 6-8 hours to get in and out of that river due to tides. If we can have less time with two ships waiting out at sea costs will fall.[/QUOTE]
    I believe with bigger barges and tugs that problem should resolve itself especially with a new mooring outside the river. They have to try and load 3 x 10000 t barges every second day- so a full ship every 4 days.
    Everything will rely on the conveyor loading the barges assuming the trucks can keep up!
 
watchlist Created with Sketch. Add MMI (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.