KPO 0.00% 0.3¢ kalina power limited

To get a feel for how long commissioning may take I'm half way...

  1. 709 Posts.
    lightbulb Created with Sketch. 44
    To get a feel for how long commissioning may take I'm half way through a control system upgrade at a coal fired 365MW generator.
    Removal and fitout of the new DCS 4 weeks (should already be done here)
    Point to point device checks 3-4 weeks
    Response, trip, run back tuning and testing around 3 weeks before placed under market control with further situational testing for a month or so.
    Much more complex plant but existing brown field site.
 
watchlist Created with Sketch. Add KPO (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $7.459M
Open High Low Value Volume
0.3¢ 0.3¢ 0.3¢ $41.20K 13.80M

Buyers (Bids)

No. Vol. Price($)
2 2663179 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 10012741 12
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
KPO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.