"To get to AUD300m$ profit (200mm US$) you would need to get 100% of Sarawak smelting profit, and then keep the H1 run rate, and then double it (11 + 5 + 44 x 2 x 2)."
the calculation again, is wrong. Now u r claiming to be accurate. I am not.
the additional 33% increase isnt subject to the existing overhead.
lets take ur 44million figure. If u increased it by 33%, it would come up to 57million. Ps:this 44million figure isnt accurate either.
however, the big cost items r static costs.
ie: depreciation, finance cost, staff overhead. These r all accounted for in the first 75% of production. The margin from the additional 33% production increase flows to the bottomline.
lets say thats about 100,000 tonnes of product. If u have a 300usd gross margin most of that goes to the bottomline. So its a 30mil increase on the 44mil.
- Forums
- ASX - By Stock
- Ann: MEDIA RELEASE H1 2022 NPAT USD60 Million UP 231%
"To get to AUD300m$ profit (200mm US$) you would need to get...
-
- There are more pages in this discussion • 167 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OMH (ASX) to my watchlist
(20min delay)
|
|||||
Last
36.5¢ |
Change
-0.015(3.95%) |
Mkt cap ! $279.6M |
Open | High | Low | Value | Volume |
37.0¢ | 37.0¢ | 36.5¢ | $4.825K | 13.18K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 18895 | 36.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
37.5¢ | 20000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1400 | 0.365 |
2 | 1010 | 0.360 |
1 | 10000 | 0.355 |
1 | 6 | 0.350 |
2 | 31500 | 0.330 |
Price($) | Vol. | No. |
---|---|---|
0.400 | 115125 | 3 |
0.415 | 4350 | 1 |
0.455 | 6528 | 1 |
0.485 | 11740 | 2 |
0.500 | 7000 | 1 |
Last trade - 14.23pm 13/09/2024 (20 minute delay) ? |
Featured News
OMH (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online