"To get to AUD300m$ profit (200mm US$) you would need to get 100% of Sarawak smelting profit, and then keep the H1 run rate, and then double it (11 + 5 + 44 x 2 x 2)."
the calculation again, is wrong. Now u r claiming to be accurate. I am not.
the additional 33% increase isnt subject to the existing overhead.
lets take ur 44million figure. If u increased it by 33%, it would come up to 57million. Ps:this 44million figure isnt accurate either.
however, the big cost items r static costs.
ie: depreciation, finance cost, staff overhead. These r all accounted for in the first 75% of production. The margin from the additional 33% production increase flows to the bottomline.
lets say thats about 100,000 tonnes of product. If u have a 300usd gross margin most of that goes to the bottomline. So its a 30mil increase on the 44mil.
- Forums
- ASX - By Stock
- Ann: MEDIA RELEASE H1 2022 NPAT USD60 Million UP 231%
"To get to AUD300m$ profit (200mm US$) you would need to get...
-
- There are more pages in this discussion • 167 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OMH (ASX) to my watchlist
|
|||||
Last
47.0¢ |
Change
0.020(4.44%) |
Mkt cap ! $360.1M |
Open | High | Low | Value | Volume |
44.5¢ | 47.0¢ | 44.5¢ | $6.948K | 15.43K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 44.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
48.5¢ | 11740 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 0.445 |
1 | 8000 | 0.440 |
4 | 28826 | 0.435 |
3 | 20380 | 0.420 |
3 | 39000 | 0.400 |
Price($) | Vol. | No. |
---|---|---|
0.485 | 11740 | 2 |
0.500 | 12000 | 2 |
0.550 | 207074 | 1 |
0.565 | 11000 | 1 |
0.580 | 1450 | 1 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
OMH (ASX) Chart |