At the moment growth prospects look very promising. 2023 will have the cmsb stake and 100% furnaces online.
There will be the 2 new large furnaces coming online in late 2023 or 2024.
At 2025 the 10million tonne steel smelter in samalaju will come online. So omh can sell to them without logistical costs. As well as other steel smelters in the south east asia region.
post this period supply from china is expected to fall. Likely the subsidies will dry up.
and its trailing 12 month pe is 3.4.
omh isnt a regular smelter. Their electricity cost is likely below the generation cost for most other furnaces.
- Forums
- ASX - By Stock
- OMH
- Ann: MEDIA RELEASE H1 2022 NPAT USD60 Million UP 231%
Ann: MEDIA RELEASE H1 2022 NPAT USD60 Million UP 231%, page-69
-
- There are more pages in this discussion • 118 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OMH (ASX) to my watchlist
(20min delay)
|
|||||
Last
36.5¢ |
Change
-0.015(3.95%) |
Mkt cap ! $279.6M |
Open | High | Low | Value | Volume |
37.0¢ | 37.0¢ | 36.5¢ | $4.825K | 13.18K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 18895 | 36.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
37.5¢ | 20000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1400 | 0.365 |
2 | 1010 | 0.360 |
1 | 10000 | 0.355 |
1 | 6 | 0.350 |
2 | 31500 | 0.330 |
Price($) | Vol. | No. |
---|---|---|
0.400 | 115125 | 3 |
0.415 | 4350 | 1 |
0.455 | 6528 | 1 |
0.485 | 11740 | 2 |
0.500 | 7000 | 1 |
Last trade - 14.23pm 13/09/2024 (20 minute delay) ? |
Featured News
OMH (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online