VEN 5.00% 1.0¢ vintage energy ltd

It's mostly because from this update there were 6 main points....

  1. 306 Posts.
    lightbulb Created with Sketch. 146
    It's mostly because from this update there were 6 main points. Of these points, 1 (Val- 1) is operational now and producing to expectations.

    The other 5 points are future statements which of course a company like VEN is always going to have given it is an emerging producer but the problem with future statements is that the dates often change and technical issues can occur. If the other 5 points change to become that they are all operational according to expectations then there will be a much more positive outlook for VEN. If they can get all of these done by the end of 2023 then they will be doing well.

    ➢ Odin Site works underway and progressing to plan
    ➢ Odin project on schedule for first gas before end Q3 CY2023
    ➢ Vali-1 gas production performance in line with expectations
    ➢ Vali-2 fluid removal operations yield high fluid production with some gas
    ➢ Vali-2 shut-in pending production log analysis of zonal gas and fluid
    ➢ Vali-3 re-instatement operations expected in the second half of August
 
watchlist Created with Sketch. Add VEN (ASX) to my watchlist
(20min delay)
Last
1.0¢
Change
-0.001(5.00%)
Mkt cap ! $15.86M
Open High Low Value Volume
0.9¢ 1.0¢ 0.9¢ $10.52K 1.160M

Buyers (Bids)

No. Vol. Price($)
17 7019011 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 5849690 12
View Market Depth
Last trade - 13.38pm 21/06/2024 (20 minute delay) ?
VEN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.