Alameda 1 is a fairly complicated deviated multi structural target with estimated time of 60-70 days., the well will look to intersect commercial HCs in the U1, N and Alameda targets.
Drilling here can be problematic with mud losses prone for the formations present.
Zapato should be easier , slightly shallower main target...however it will still be a 40+ day well
$10 mm a well has not been stated I think, what has been stated as far as I can see is $20-25mm for a 2 well campaign., I envisage 60% of the total cost would be on the more complicated deviated multi zone Alameda well.
All costs however should be covered by farminee
I still envisage Melbana will only hold @ 30 % equity when drilling commences..
They will be looking for a fully funded and carried solution for drilling block 9.
- Forums
- ASX - By Stock
- Ann: Melbana Operational Update
Alameda 1 is a fairly complicated deviated multi structural...
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.1¢ |
Change
0.001(3.33%) |
Mkt cap ! $104.4M |
Open | High | Low | Value | Volume |
3.0¢ | 3.2¢ | 3.0¢ | $30.13K | 991.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 1062428 | 3.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.1¢ | 212937 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 1062428 | 0.030 |
15 | 1932384 | 0.029 |
13 | 3746617 | 0.028 |
7 | 1614740 | 0.027 |
5 | 1988499 | 0.026 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 212937 | 2 |
0.032 | 127016 | 2 |
0.033 | 723869 | 7 |
0.034 | 1125000 | 3 |
0.035 | 1040266 | 2 |
Last trade - 16.10pm 06/11/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |