MAY 4.17% 2.3¢ melbana energy limited

Alameda 1 is a fairly complicated deviated multi structural...

  1. 623 Posts.
    lightbulb Created with Sketch. 278
    Alameda 1 is a fairly complicated deviated multi structural target with estimated time of 60-70 days., the well will look to intersect commercial HCs in the U1, N and Alameda targets.
    Drilling here can be problematic with mud losses prone for the formations present.
    Zapato should be easier , slightly shallower main target...however it will still be a 40+ day well

    $10 mm a well has not been stated I think, what has been stated as far as I can see is $20-25mm for a 2 well campaign., I envisage 60% of the total cost would be on the more complicated deviated multi zone Alameda well.

    All costs however should be covered by farminee
    I still envisage Melbana will only hold @ 30 % equity when drilling commences..
    They will be looking for a fully funded and carried solution for drilling block 9.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.3¢
Change
-0.001(4.17%)
Mkt cap ! $77.51M
Open High Low Value Volume
2.3¢ 2.4¢ 2.2¢ $61.98K 2.702M

Buyers (Bids)

No. Vol. Price($)
4 753326 2.3¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 2582136 17
View Market Depth
Last trade - 16.10pm 29/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.