-
Share
30/08/16
16:11
Share
Dam I never knew that.
Here I am having drilled two slim wildcat oil exploration wells in WA using a slightly improved mineral rig with a 5,000 bop.
Only recovered some 3,500 m of core to TD.
Didn't realised you couldn't do that!!
Guess what didn't need to run expensive wireline logs either as I had core samples to surface in 30m lengths
Mud chemicals, fuel burn, camp size was a 1/3 of a conventional well.
Road construction of 350 km dirt needed less gravel surface
Dam if only I had know.
-