The biggest co - incidence for me at the time of the integration study release I calculated the Life of mine opex per pound of V205 mined at $6.90 opex or very close to that for the integrated portion for GVP plus Yarrabubba initial reserve.
Conspiracy coming up:
Guess what the AVL BFS V205 C1 mining cost was exactly $6.90.
This merger deal has been in the works for some time I reckon and then been sold to the government as exactly the same project opex and fundamentals.
TMTs bankable model with the at surface material included will blow AVL BFS out of the water in my opinion.
I can say the maths does not lie.
again makes sense to me!
Add to My Watchlist
What is My Watchlist?