It will be "back to the drawing board" for both TMT and AVL, because a revised DFS/BFS will be needed for the merged project. So add another year or 18 months at least for that to happen before the thing can move forward again. Perhaps even longer if they have to re-apply to the EPA. I think a lot of investors will pull the pin on this now.
All IMHO, DYOR