88E 25.0% 0.3¢ 88 energy limited

Ann: Merlin-2 Pre-Spud Operations On Track, page-4

  1. 449 Posts.
    lightbulb Created with Sketch. 306
    The well is planned to be initially drilled to 2,000 feet, with the surface casing then installed and the Blow Out Preventer system tested.
    This is anticipated to collectively take approximately one week.

    Drilling to TD is then expected to take a further four weeks, including wireline logging.

    Same timeline as last year by the looks of it.

    GLTAH
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.001(25.0%)
Mkt cap ! $57.78M
Open High Low Value Volume
0.2¢ 0.3¢ 0.2¢ $4.789K 2.042M

Buyers (Bids)

No. Vol. Price($)
456 916146810 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 393837810 65
View Market Depth
Last trade - 10.15am 28/05/2024 (20 minute delay) ?
Last
0.3¢
  Change
0.001 ( 3.85 %)
Open High Low Volume
0.3¢ 0.3¢ 0.3¢ 2415166
Last updated 10.25am 28/05/2024 ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.