The well is planned to be initially drilled to 2,000 feet, with the surface casing then installed and the Blow Out Preventer system tested.
This is anticipated to collectively take approximately one week.
Drilling to TD is then expected to take a further four weeks, including wireline logging.
Same timeline as last year by the looks of it.
GLTAH
- Forums
- ASX - By Stock
- 88E
- Ann: Merlin-2 Pre-Spud Operations On Track
Ann: Merlin-2 Pre-Spud Operations On Track, page-4
- There are more pages in this discussion • 165 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 88E (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.001(25.0%) |
Mkt cap ! $57.78M |
Open | High | Low | Value | Volume |
0.2¢ | 0.3¢ | 0.2¢ | $4.789K | 2.042M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
456 | 916146810 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 393837810 | 65 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
455 | 914646810 | 0.002 |
116 | 605541048 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 393837810 | 65 |
0.004 | 510289737 | 201 |
0.005 | 238011915 | 98 |
0.006 | 77938535 | 70 |
0.007 | 235781401 | 41 |
Last trade - 10.15am 28/05/2024 (20 minute delay) ? |
|
|||||
Last
0.3¢ |
  |
Change
0.001 ( 3.85 %) |
|||
Open | High | Low | Volume | ||
0.3¢ | 0.3¢ | 0.3¢ | 2415166 | ||
Last updated 10.25am 28/05/2024 ? |
Featured News
88E (ASX) Chart |