88E 50.0% 0.3¢ 88 energy limited

Ann: Merlin-2 Pre-Spud Operations On Track, page-42

  1. 1,651 Posts.
    lightbulb Created with Sketch. 230
    When Lincs Energy drilled Umiat-18 the rig stayed on the pad until 27/04 before trundling off to rest at Umiat Airport ready for U-23H the next winter.
    if warranted flow testing should not need the presence of the rig so should be time.
    This year the tundra has frozen deep so we should hopefully enjoy a decent season and the snow road should stay in condition until late April, what kills the snow road is the lengthening daylight hours late April will be the limit.
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.001(50.0%)
Mkt cap ! $86.67M
Open High Low Value Volume
0.3¢ 0.3¢ 0.2¢ $5.395K 2.133M

Buyers (Bids)

No. Vol. Price($)
192 298574579 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 590044986 215
View Market Depth
Last trade - 16.10pm 18/07/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.