88E 25.0% 0.3¢ 88 energy limited

Ann: Merlin-2 Pre-Spud Operations On Track, page-42

  1. 1,654 Posts.
    lightbulb Created with Sketch. 231
    When Lincs Energy drilled Umiat-18 the rig stayed on the pad until 27/04 before trundling off to rest at Umiat Airport ready for U-23H the next winter.
    if warranted flow testing should not need the presence of the rig so should be time.
    This year the tundra has frozen deep so we should hopefully enjoy a decent season and the snow road should stay in condition until late April, what kills the snow road is the lengthening daylight hours late April will be the limit.
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.001(25.0%)
Mkt cap ! $72.33M
Open High Low Value Volume
0.2¢ 0.3¢ 0.2¢ $5.009K 2.249M

Buyers (Bids)

No. Vol. Price($)
47 96266624 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 600926597 231
View Market Depth
Last trade - 15.56pm 23/08/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.