When Lincs Energy drilled Umiat-18 the rig stayed on the pad until 27/04 before trundling off to rest at Umiat Airport ready for U-23H the next winter.
if warranted flow testing should not need the presence of the rig so should be time.
This year the tundra has frozen deep so we should hopefully enjoy a decent season and the snow road should stay in condition until late April, what kills the snow road is the lengthening daylight hours late April will be the limit.
- Forums
- ASX - By Stock
- Ann: Merlin-2 Pre-Spud Operations On Track
When Lincs Energy drilled Umiat-18 the rig stayed on the pad...
-
- There are more pages in this discussion • 127 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 88E (ASX) to my watchlist
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $57.78M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $59.5K | 29.75M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
357 | 427436320 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 624604737 | 138 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
357 | 427436320 | 0.002 |
150 | 655724747 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 624604737 | 138 |
0.004 | 337722421 | 129 |
0.005 | 55021391 | 58 |
0.006 | 107861808 | 40 |
0.007 | 42255231 | 34 |
Last trade - 10.00am 01/07/2024 (20 minute delay) ? |
Featured News
88E (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
Previous Video
Next Video
SPONSORED BY The Market Online