When Lincs Energy drilled Umiat-18 the rig stayed on the pad until 27/04 before trundling off to rest at Umiat Airport ready for U-23H the next winter.
if warranted flow testing should not need the presence of the rig so should be time.
This year the tundra has frozen deep so we should hopefully enjoy a decent season and the snow road should stay in condition until late April, what kills the snow road is the lengthening daylight hours late April will be the limit.
- Forums
- ASX - By Stock
- Ann: Merlin-2 Pre-Spud Operations On Track
When Lincs Energy drilled Umiat-18 the rig stayed on the pad...
-
- There are more pages in this discussion • 127 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 88E (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $57.86M |
Open | High | Low | Value | Volume |
0.2¢ | 0.3¢ | 0.2¢ | $2.595K | 1.271M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
85 | 90974037 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 568094960 | 235 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
77 | 88971537 | 0.002 |
489 | 1235166325 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 533370945 | 223 |
0.004 | 197358139 | 117 |
0.005 | 111628391 | 48 |
0.006 | 36289234 | 34 |
0.007 | 39505108 | 24 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
88E (ASX) Chart |