88E 50.0% 0.3¢ 88 energy limited

Ann: Merlin-2 Pre-Spud Operations On Track, page-4

  1. 449 Posts.
    lightbulb Created with Sketch. 306
    The well is planned to be initially drilled to 2,000 feet, with the surface casing then installed and the Blow Out Preventer system tested.
    This is anticipated to collectively take approximately one week.

    Drilling to TD is then expected to take a further four weeks, including wireline logging.

    Same timeline as last year by the looks of it.

    GLTAH
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.001(50.0%)
Mkt cap ! $86.67M
Open High Low Value Volume
0.3¢ 0.3¢ 0.2¢ $10.05K 3.566M

Buyers (Bids)

No. Vol. Price($)
152 214316072 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 581110328 194
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.