88E 0.00% 0.3¢ 88 energy limited

Ann: Merlin-2 Pre-Spud Operations On Track, page-149

  1. 143 Posts.
    lightbulb Created with Sketch. 273
    Calm down. check last year’s ann below.
    Actual Drilling commenced on 10th (was planned on 8th), Ann Operations Update came on 11th March.

    This year we were told drilling to commence on Week commencing 7th (not on 7th!!) , so we are on track and will most probably looking days same as last year.
    Ann is imminent and we will get it on time, any serious changes to plan would have to be reported too.

    patience! This is the week / month we have been eaiting for. Good luck!

    #GLTAH

    https://hotcopper.com.au/data/attachments/4151/4151977-a587a0af857f366594ff028c2f6c271c.jpg
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $86.67M
Open High Low Value Volume
0.3¢ 0.3¢ 0.2¢ $83.50K 28.71M

Buyers (Bids)

No. Vol. Price($)
584 1051136741 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 396130660 97
View Market Depth
Last trade - 16.10pm 03/06/2024 (20 minute delay) ?
Last
0.3¢
  Change
0.000 ( 0.00 %)
Open High Low Volume
0.3¢ 0.3¢ 0.3¢ 112292605
Last updated 15.17pm 03/06/2024 ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.