88E 0.00% 0.3¢ 88 energy limited

Ann: Merlin-2 Pre-Spud Operations On Track, page-4

  1. 449 Posts.
    lightbulb Created with Sketch. 306
    The well is planned to be initially drilled to 2,000 feet, with the surface casing then installed and the Blow Out Preventer system tested.
    This is anticipated to collectively take approximately one week.

    Drilling to TD is then expected to take a further four weeks, including wireline logging.

    Same timeline as last year by the looks of it.

    GLTAH
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $86.67M
Open High Low Value Volume
0.3¢ 0.4¢ 0.3¢ $110.3K 36.34M

Buyers (Bids)

No. Vol. Price($)
581 606908815 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 558823394 128
View Market Depth
Last trade - 16.10pm 13/05/2024 (20 minute delay) ?
Last
0.3¢
  Change
0.000 ( 14.3 %)
Open High Low Volume
0.3¢ 0.4¢ 0.3¢ 23794601
Last updated 14.04pm 13/05/2024 ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.