The question will be one of volume, if it's 2m wide, they have 50m up dip to stope, and they have 50m length of high grade, at an sg of 3, that's in the order of 15k tonnes, can they get it out in 3 months? Let's hope so, should make some good money.
I think they need to start doing some drilling, don't need JORC status classification, just need to get the geometry right for mine planning. Good looking vein, so let's hope they can get the tonnes out!
MNE Price at posting:
1.7¢ Sentiment: Buy Disclosure: Not Held