Kingkev.
You did not read the ANN correct it is still low grade and another 250-300T still under ground they are just mining
the SMALL area @4%.They are good at telling you the grades they have I bet you see any grades of what was sent to the mill. We will see revenue from the mill but no profit until September.
Currently, the surface stockpile at Panga contains approximately 400 tonnes of material extracted from the shafts and development tunnels, and a further 250 tonnes to 300 tonnes remains underground, which is used to access the stope area. Trucking of the surface stockpile has commenced and it is expected that between 300 tonnes and 500 tonnes of material will be delivered each week continuously from Panga and this will increase once additional stoping areas are prepared and extracted.
MNE Price at posting:
2.0¢ Sentiment: None Disclosure: Held