The new CEO seems to have put some good structure behind this one, it is great to actually have a project with a plan detailed and tracked to.
TS was all bluster and not delivery, hid when his outragous promises went unfulfilled.
This guys seems to be transparent and capable. Best of luck everyone with getting somewhere with this one.
- Forums
- ASX - By Stock
- Ann: Metallurgical Test Work Results for Project Block 103
The new CEO seems to have put some good structure behind this...
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CLE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.47M |
Open | High | Low | Value | Volume |
0.1¢ | 0.1¢ | 0.1¢ | $18 | 17.70K |
Featured News
CLE (ASX) Chart |