little to nothing to show economic.
oh like the transport study in the ss and 5mtpa which detailed opex costs and capital costs required?
they didn't used 850 it was 750 which is correct. PLS pricing shouldn't be used as a benchmark lol - it's not the markets fault we're getting screwed over there. need to broaden your views. same reason gxy and ajm getting better pricing than pls for a lower grade product.
npv will increase significantly with extra resource in fill drilling extending mine live. capex and opex will decrease if hms or dms only I expect maybe 60% of capex compared to flotation circuit.
sorry but you've got zero idea. everything you've stated is wrong and in fact the opposite. opposing ideas are welcomed but none of these are factually based or referenced.
SF2TH
- Forums
- ASX - By Stock
- Ann: Metallurgical Test Work Update
little to nothing to show economic.oh like the transport study...
-
-
- There are more pages in this discussion • 72 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)