Hi Ozesplat --- from the report -if others have posted these - OK no harm done.
Page 2 3rd para next to the pic:-
Paris is a shallow, high-grade silver deposit amenable to open pit mining with an updated resourceestimate due to be finalised within weeks. In conjunction with this metallurgical test work program,mine design and optimisation will culminate in thedelivery of a Pre-Feasibility Study in July 2021.
Page 3 3rd para.:-
“With the revised Paris Mineral Resource estimate anticipated to be available for ASX review in
June, completion of this metallurgical testwork provides another vital component in progressing
the Paris Silver Project PFS”.
- Forums
- ASX - By Stock
- IVR
- Ann: Metallurgical Testwork Improves Paris Silver Recoveries
Ann: Metallurgical Testwork Improves Paris Silver Recoveries, page-36
-
-
- There are more pages in this discussion • 36 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVR (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.9¢ |
Change
0.005(14.7%) |
Mkt cap ! $61.96M |
Open | High | Low | Value | Volume |
3.7¢ | 3.9¢ | 3.7¢ | $104.2K | 2.790M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 40500 | 3.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.9¢ | 559340 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 40500 | 0.037 |
1 | 750000 | 0.036 |
5 | 1398014 | 0.035 |
3 | 1210000 | 0.034 |
2 | 246702 | 0.032 |
Price($) | Vol. | No. |
---|---|---|
0.039 | 559340 | 3 |
0.040 | 700000 | 3 |
0.041 | 282402 | 2 |
0.042 | 280558 | 2 |
0.043 | 692800 | 4 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
IVR (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online