INR 0.00% 13.5¢ ioneer ltd

Ann: Metallurgy Update Nevada Lithium-Boron Project, page-10

  1. 8,133 Posts.
    lightbulb Created with Sketch. 157
    Well yes. The latest announcement makes no mention of the 2 drill holes being put down in the North Basin.
    The only mention in the latest met result was-

    "The latest results are from a sample of Li-B mineralisation collected from outcrop from within the South Basin Mineral Resource and are considered to be representative of the high-grade Li-B searlesite mineralisation."

    From a December announcement -

    "The North Basin mineralisation is not included in the current Resource. This will be followed by a minimum of two holes at South Basin which will target extensions to the Searlesite Zone."

    The December QTR said- " Maiden drill program completed with two holes at North Basin and three holes at South Basin – results pending"

    Also from the same QTRLY - " Three holes drilled at South Basin tested for extensions to the high-grade Li-B searlesite mineralisation. All drill holes are outside the current Resource area. Assay results are expected over the next 2 to 3 weeks. Core samples from the North Basin have been added to the metallurgical program to ensure all types of mineralisation are tested.


    Have I missed those results? Usually when you announce a drilling program you announce the results of those holes... particularly for the North Basin.
 
watchlist Created with Sketch. Add INR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.