INR 0.00% 13.5¢ ioneer ltd

Ann: Metallurgy Update Nevada Lithium-Boron Project, page-11

  1. 8,133 Posts.
    lightbulb Created with Sketch. 157
    "Initial drilling program completed with 2 holes at North Basin and 3 holes at South Basin – assay result expected over the next 3-4 weeks"

    That was from a 23/01/17 announcement.
    Haven't seen those results to the best of my knowledge.
 
watchlist Created with Sketch. Add INR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.