MGU 23.1% 1.6¢ magnum mining and exploration limited

This was a big surprise to me.Iron ore prices are still near...

  1. 71 Posts.
    lightbulb Created with Sketch. 108
    This was a big surprise to me.

    Iron ore prices are still near $140 a tonne, so to cancel a project 4 months before first shipment is a bit crazy.

    The main reason I got into this project was the low Capex DSO option for two years, which would have gone a long way to funding the 68% concentrate plant and the HISMELT plant. It would be good to know the reason for moving away from this plan.

    I'm down about 50% now and I tried to catch a falling knife by doubling down, which doesn't seem like the smartest move now. Wondering if I should double down again, but without guidance, it's hard to do so
 
watchlist Created with Sketch. Add MGU (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.