EM2 8.70% 7.5¢ eagle mountain mining limited

Ann: Mid-Tier Copper Production Focus for Scoping Study, page-13

  1. 2,971 Posts.
    lightbulb Created with Sketch. 249
    People will be surprised how low the capex will be. Alot of the ground work is completed during the past 3 years.

    Tailings dam and plant is all they need.
    Access portals are done.
    18km of tunnels in place and mine ready. Ventilation done
    Power done
    Safety inspection done
    Camp site done
    Some permits done.

    Anyway at 7cents we're cheap and I'll add thru the rights issue.

    Cheers
 
watchlist Created with Sketch. Add EM2 (ASX) to my watchlist
(20min delay)
Last
7.5¢
Change
0.006(8.70%)
Mkt cap ! $29.46M
Open High Low Value Volume
7.2¢ 7.7¢ 7.2¢ $81.12K 1.098M

Buyers (Bids)

No. Vol. Price($)
1 56021 7.3¢
 

Sellers (Offers)

Price($) Vol. No.
7.5¢ 386158 3
View Market Depth
Last trade - 16.10pm 14/05/2024 (20 minute delay) ?
Last
7.4¢
  Change
0.006 ( 2.78 %)
Open High Low Volume
7.2¢ 7.6¢ 7.2¢ 464252
Last updated 15.41pm 14/05/2024 ?
EM2 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.