Yes - you're correct - "Themodel-calculated Net Power to the Grid ranges from 9.6 MWe to 14.7 MWe for three doublets." Silly me..
In this case, the mid-point of about 12 MWe might earn around 12 x 24 x 365 x $100 = $10.5 million per year gross income against construction cost of $60-90 million - so better and likely to improve with focussed exploration.. There's no harm in emphasizing this strategy in future releases.
- Forums
- ASX - By Stock
- Ann: Mid-West Geothermal Power Project Inferred Resource
Yes - you're correct - "Themodel-calculated Net Power to the...
-
- There are more pages in this discussion • 29 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
(20min delay)
|
|||||
Last
22.5¢ |
Change
0.005(2.27%) |
Mkt cap ! $643.6M |
Open | High | Low | Value | Volume |
22.5¢ | 23.0¢ | 22.0¢ | $2.095M | 9.322M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
37 | 1543383 | 22.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
22.5¢ | 613863 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
35 | 1420258 | 0.220 |
25 | 2507908 | 0.215 |
31 | 3138998 | 0.210 |
30 | 905703 | 0.205 |
64 | 3874096 | 0.200 |
Price($) | Vol. | No. |
---|---|---|
0.225 | 541242 | 3 |
0.230 | 778336 | 21 |
0.235 | 1597043 | 18 |
0.240 | 488761 | 11 |
0.245 | 400000 | 2 |
Last trade - 16.10pm 09/07/2024 (20 minute delay) ? |
Featured News
STX (ASX) Chart |