HXG 4.55% 2.3¢ hexagon energy materials limited

Ann: MIN: McIntosh Joint Venture Termination, page-2

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 123 Posts.
    lightbulb Created with Sketch. 39
    Hexagon announcement 06.06.2019
    been 4 months now, they must have these met test work results back by now. Actually thought they already done a whole heap of met testing work and have proved all the good stuff with all 9's (5x9s) but, subject to the outcome of the met test work in China, the MJV had planned to complete follow up locked cycle and pilot scale floatation tests to go into the feasibility study. Now looking at the timing with this it does raise the question, did minres walk from the JV because these Chinese test work results were no good? If you assume the results were good then they would have commenced the locked cycle and pilot scale floatation a while weeks back for it to be included in the feasibility study that was to be due on 14.11.2019.
    We should be seeing the results of this Hexagon commissioned met test work done in China soon,
    and it will be interesting to see if Hexagon still goes ahead with the locked cycle and pilot scale flotation test work.
    All IMOO DYOR

    https://hotcopper.com.au/data/attachments/1755/1755369-5ab319c029adc910177974cd05c77712.jpg
 
watchlist Created with Sketch. Add HXG (ASX) to my watchlist
(20min delay)
Last
2.3¢
Change
0.001(4.55%)
Mkt cap ! $11.28M
Open High Low Value Volume
2.2¢ 2.3¢ 2.2¢ $24.45K 1.092M

Buyers (Bids)

No. Vol. Price($)
1 37 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 326201 1
View Market Depth
Last trade - 15.36pm 06/11/2024 (20 minute delay) ?
HXG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.