- Release Date: 30/10/13 19:26
- Summary: MINE: BRL: Increase in Resources for Buller Coal Project
- Price Sensitive: No
- Download Document 1.46KB
BRL 30/10/2013 17:26 MINE REL: 1726 HRS Bathurst Resources (New Zealand) Limited MINE: BRL: Increase in Resources for Buller Coal Project Increase in Resources at Buller Coal Project Highlights: - Increase in Total Resource of 4.5% to 108.7 mt - Increase in Measured Resource of 33% to 21.3 mt - Maiden Measured Resource for North Buller of 2.4 mt Bathurst Resources (New Zealand) Limited (NZX/ ASX: BRL, "Bathurst") is pleased to announce an update to the coal resource tonnage for the Buller Coal Project. During the past year Bathurst has concentrated its exploration and interpretation programme on increasing the confidence in the known resources for South Buller and expanding the knowledge base of the North Buller permits. Since late 2012, a drilling programme of 96 holes was conducted across the North Buller permits and 55 holes were drilled across the Denniston area. This resulted in an overall increase in stated resources of 4.7 million tonnes, taking the company's total resource base to 108.7 million tonnes. A Measured Resource for North Buller has also been announced of 2.4mt. Bathurst Managing Director Hamish Bohannan said: "We will be continuing with exploration programmes designed to increase our knowledge of the geology and stratigraphy of the Buller coal measures. This will lead to an increased confidence in the resource base of the project overall." The updated Resource Table is enclosed. End CA:00243084 For:BRL Type:MINE Time:2013-10-30 17:26:16
Add to My Watchlist
What is My Watchlist?