- Release Date: 07/10/13 16:00
- Summary: MINE: CUE: Naga Utara-2 Well, Mahakam Hilir PSC, Indonesia
- Price Sensitive: No
- Download Document 1.58KB
CUE 07/10/2013 14:00 MINE REL: 1400 HRS Cue Energy Resources Limited MINE: CUE: Naga Utara-2 Well, Mahakam Hilir PSC, Indonesia RELEASE (ASX: CUE; NZX: CUE; POMSOX: CUE; ADR/OTC: CUEYY) Naga Utara-2 Well, Mahakam Hilir PSC, East Kalimantan, Indonesia Cue Energy Resources Ltd (Cue) advises that the Naga Utara-2 well spudded on 5th October 2013. The well site is located in the onshore portion of the Kutei Basin on the island of Kalimantan (Borneo), approximately 10 km NE of the town of Samarinda. The well is operated by SPC Mahakam Hilir Pte Ltd, a subsidiary of Singapore Petroleum Company Ltd. The well is the third to be drilled by the Mahakam Hilir Joint Venture and will appraise the gas shows seen in Miocene-age sandstones at Naga Utara-1 which were not fully evaluated in the previous well due to mechanical problems. The well will then be deepened to evaluate additional reservoir objectives. The well is being drilled from the same pad as Naga Utara-1 to a target location approximately 475m north of the earlier well. Naga Utara-2 has a proposed TD of 2,068mMD (1,981mTVD) and drilling is expected to take approximately 62 days. Cue will provide weekly progress reports during the drilling of Naga Utara-2. Participating interests in the Mahakam Hilir PSC are as follows: Cue Mahakam Hilir Pty Ltd 40% SPC Mahakam Hilir Pte Ltd 60% (Operator) Any queries regarding the announcement should be directed to the Company on (03) 9670 8668 or email [email protected]. David A.J. Biggs Chief Executive Officer 7 October 2013 End CA:00242069 For:CUE Type:MINE Time:2013-10-07 14:00:11
Add to My Watchlist
What is My Watchlist?