NTL new talisman gold mines limited

Ann: MINE: NTL: Stockpiled Talisman Ore Prepared for Treatment

  1. lightbulb Created with Sketch. 2
    • Release Date: 08/09/14 10:14
    • Summary: MINE: NTL: Stockpiled Talisman Ore Prepared for Treatment
    • Price Sensitive: No
    • Download Document  1.7KB
    					NTL
    08/09/2014 10:14
    MINE
    
    REL: 1014 HRS New Talisman Gold Mines Limited
    
    MINE: NTL: Stockpiled Talisman Ore Prepared for Treatment
    
    NTL previously announced it had moved approximately 50 tonnes of ore
    stockpiled on the Talisman mine pad to an external storage facility.
    
    NTL is pleased to announce today that it has removed a further 22 tonnes of
    ore that remained on the Talisman mine pad to a crushing facility nearby the
    mine. This ore was crushed and sampled and then moved in bins to a secure
    storage facility.
    
    NTL is also pleased to announce today that the 50 tonnes of ore previously
    removed from the pad were recently relocated to a crushing facility for
    crushing and sampling. Previous spot samples of this ore showed overage
    grades greater than an ounce per ton.
    
    The crushing process allows for an homogenous sample representative of the
    entire batch to be taken for detailed analysis of the gold and silver
    content.  The results of the analytical testing are expected to be released
    in the next week.
    
    This ore is now ready for processing following sampling by both parties at
    our potential toll treatment partner's facility.
    
    Attached to this release are pictures of the ore being removed from the pad
    and the crushing process.
    
    Executive Director Matthew Hill noted "The board is delighted with progress
    on removing and crushing the stockpiled ore in preparation for pilot testing
    with our potential toll treatment partners. Once sampling is complete we will
    be in a position to ascertain the value of the first ore off Talisman in
    decades and we hope to be in a position to finalise toll treatment
    arrangements in the coming weeks once sampling is complete."
    End CA:00254973 For:NTL    Type:MINE       Time:2014-09-08 10:14:22
    				
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.