NZO new zealand oil & gas ltd ordinary shares

Ann: MINE: NZO: Flow Testing begins at Kisaran

  1. lightbulb Created with Sketch. 2
    					
    
    NZO
    30/04/2013 11:55
    MINE
    
    REL: 1155 HRS New Zealand Oil and Gas Limited
    
    MINE: NZO: Flow Testing begins at Kisaran
    
    Flow testing has begun at the Parit Minyak-2 (PM-2) exploration well, located
    in the Kisaran PSC in onshore Sumatra, Indonesia.
    
    An announcement was made previously that a decision had been taken to conduct
    up to four drill stem tests (DSTs) within a gross interval of 7700 to 9000
    feet, based on wireline logging results.
    
    Depending on the types of fluids and rates of flow this testing program could
    take 20 to 35 days.
    
    Further announcement about progress in testing will be made when approved by
    the Indonesian regulator.
    
    New Zealand Oil & Gas Ltd has a 22.5% stake in the joint venture through the
    share ownership of its subsidiary NZOG Asia Pty Ltd in Pacific Oil & Gas
    (North Sumatera) Ltd. The Kisaran Joint Venture partners are Pacific Oil &
    Gas (Kisaran) Ltd (55 per cent and operator) and Pacific Oil & Gas (Sumatera)
    Inc. (22.5 per cent).
    
    Ends.
    
    John Pagani
    External Relations Manager
    M: +64 21 570 872
    End CA:00235660 For:NZO    Type:MINE       Time:2013-04-30 11:55:54
    				
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.